• High Capacity Cement Block Making Machine
  • High Capacity Cement Block Making Machine
  • High Capacity Cement Block Making Machine
  • High Capacity Cement Block Making Machine
  • High Capacity Cement Block Making Machine
  • High Capacity Cement Block Making Machine

High Capacity Cement Block Making Machine

After-sales Service: Provided
Warranty: 1year
Type: Concrete Pump
Machining Process: Welded Molding Machine
Productivity: 80cbm/H
Certification: ISO9001: 2000, CE, Eac
Customization:

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Group Corporation

Basic Info.

Model NO.
SBS20-08-30
Condition
New
Color
According to The Customer′s Requirement
Rated Power
110kw
Distribution Valve Type
S Pipe Valve
Theory Maximum Capacity
80 Cubic Meters Per Hour
Transport Package
Container
Specification
80cbm/h
Trademark
FYG
Origin
Shandong, China
HS Code
8413400000
Production Capacity
500sets/Year

Product Description

Portable Concrete Mixer Pump

 

Introducing the SBS20-08-30 Portable Concrete Mixer Pump, the ultimate construction equipment for your projects. This 80cbm/h concrete pump is perfect for both construction and industrial sites, offering high efficiency and reliability. Whether you need to pump concrete for a building or infrastructure project, this construction pump is the ideal solution.

 

With its compact design and powerful performance, this concrete pump is easy to transport and operate on any job site. Say goodbye to manual labor and hello to increased productivity with this innovative pump used for construction. Don't settle for less when it comes to your concrete machinery - choose the best with the Portable Concrete Mixer Pump.

Item   Unit HBTS60-08-75 HBTS60-13-90 HBTS60-13-118 HBTS80-13-110 HBTS80-16-132 HBTS80-16-195
Maximum flow rate  High pressure m³/h 60 60 60 40 45 67
Lower pressure     74 80 80 80 95
Max.output pressure High pressure MPa 8 13 12.5 13 15.7 15.7
Lower pressure     7.3 7.3 8 9.2 9.2
Suitable Concrete Specification slump mm 80-230,better:160-200
Aggregate size mm pebble≤40,macadam≤30
Load hopper Volume L 400 500 500 500 500 500
Height mm 1375 1375 1375 1375 1375 1375
Mode of distribution   "S"Valve
Oil tank capacity L 400 500 500 500 500 500
Power system Model   Y280S-4 Y280M-4 BF4M1013 Y315S-4 Y315M-4 BF6M1013
Power kw 75 90 118 110 132 195
Pipe diameter mm φ125 φ125 φ125 φ125 φ125 φ125
Pipe cleaning   Compressed air or water washing
Delivery cylinder*stoke mm φ180*1200 φ200*1800 φ200*1800 φ200*1800 φ200*1800 φ200*1800
Dimension(L*W*H) mm 4860*1830*2000 6440*2060*2150 6770*2060*2500 6440*2060*2150 6770*2060*2150 6770*2060*2500
Weight kg 4500 6300 7100 6400 6500 7200
High Capacity Cement Block Making MachineHigh Capacity Cement Block Making MachineHigh Capacity Cement Block Making MachineHigh Capacity Cement Block Making MachineHigh Capacity Cement Block Making Machine

1. Are you manufacture?

Yes, we are manufacture of concrete pump since 1993.

2.  What is your MOQ?

One Set is OK for your order.

3. What is your price?

Please tell us the products model and quantity required, as well as your email, our sales responsible will share with you the best price.

4.Do you have discount for the orders?

It depends on your order quantity, if you have more than 2 sets machines order, there will be 5% discount of the total payment.

5. What is the delivery time?

Most of the order will within 20days, sometimes depend on your quantity and our present products plan.

6.  What is your payment term?

We can receive T/T, L/C,Western Union and so on.

7.  How about your Warranty and after sale service?

Normally is about 6 months after leaving factory.

8. OEM or ODM is available?

Yes, we can produce with your logo.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Group Corporation
Number of Employees
1857
Year of Establishment
1999-07-07