Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ency conversion control Construction self erecting tower crane frequency conversion control Const
TOWER CRANE QTZ40 (TC4708) crane machine lifting machine tower crane
TOWER CRANE QTZ40 (TC4708) crane machin
SC200/200 construction elevator elevator construction elevator construction hoists
Technical parameters |
Unit |
SC200/200 Frequency Construction hoists | |
Height | m |
300 |
|
Rated load | kg | 2000/2000 | |
Maximum capacity | 009/009 | ||
Boom lift wweight | kg | ≤200 | |
Lifting speed | m/min | 0-40 0-45 0-55 0-66 | |
Electormotor | Model | YZEJ132M(L)-4 | |
Power |
kw | 15×2/15×2 11×3/11×3 15×3/15×3 18.5×3/18.5×3 | |
Speed-limiter | Model | SAJ40-1.2A SAJ40-1.4 | |
Rated tripping speed | m/s | 1.2/1.4 | |
Standard motion speed | m/s | 1.1/1.35 | |
Rated automaticload | KN |
40 |
|
Type | gradual | ||
Reducer | Model | SWC1 TU68T TU66T | |
Center distance | mm | 125 | |
Speed radio | 1:12 1:10 | ||
Bracking distance | m | 0.3-1.2 | |
Mast section dimension | mm | 650×650×1508 | |
Crane cage inner net dimension | m | 3.0×1.3×2.2 3.2×1.5×2.2 | |
Guardrail dimension | m | 5.53×3.42×1.82 5.93×3.62×1.82 | |
Hoistway dimensions | m | ||
Free end height of the guide rail frame | m | ≤9 | |
Gounterweight weight | kg | ||
Direct attached frame | Installing interval | m/set | 006-9 |
Distance between two embedded parts | mm | ≈1488 | |
Installation dimensions from center of rail frame to building wall | mm | 2800-3200 | |
Safe and protection system | Upper and below limited switches,upper and below limit utmost switches,gate limited switch,falling avoiding safe device,cushion device,safe lock of gate,counterweight rope breaking or loose protecting device,safe hook,The safety device against overload,Anti-punching standard section etc. |
e lifting machine tower crane
ru
ction self erecting tower crane safe and reliable engineering construction tower crane smoth running Construction self erecting tower crane
frequency conversion control Construction self erecting tower crane frequency conversion control Construction self erecting tower crane safe and reliable engineering construction tower crane smooth running Construction self erecting tower crane
- - · FAQ · - -
1. Why choose us?
We are professional manufacture both for machine and spare parts since 1970. Additional to that, we also can equipped the spare parts according to customer's requirement.
2. Do you accept special orders?
A: Special order is also available because we are the factory with design and manufacturing department.
3. What is the real delivery time of your factory?
A: 10 to 20 days for general series products, but special orders will need 30 or more days based on different situations and products.
4.How do you ensure the quality of your products?
A: Generally, our equipments are the most durable type in the industry, this is also the feature of tower crane for most of our customers at home or abroad.
With our experienced quality control team, we are trying to offer most of our customers the product with best quality. Meanwhile, each of our products will passed the quality test before delivery.
5. What is the max. capacity of the tower crane?
PT series : 2T 6T 10T 16T 18T
TC series: 3T 4T 5T 6T 8T 10T 12T 16T
6. Where can we buy the machine's parts?
A: Generally, when delivery, we send customers some wearable spare parts for free for urgent requirement.We also have our spare parts warehouse,customer can confirm with us which parts are needed.
Automatic Rising or Lowering Tower Crane Automatic Rising or Lowering Tower Crane Automatic Rising Tower Crane Tower Crane