Customization: | Available |
---|---|
After-sales Service: | Video |
Warranty: | 6 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
item | unit | JS500-1.5 | JS500-2.7 | JS500-3.8 |
Charging | L | 800 | 800 | 800 |
Output | L | 500 | 500 | 500 |
Nominal output/h | m3/h | ≤25 | ≤25 | ≤25 |
Tatal power | kW | 26.75 | 26.75 | 26.75 |
Aggregate size(pebble/macadam) | mm | 80/60 | 80/60 | 80/60 |
Speed of mixing blade | r/min | 35 | 35 | 35 |
Mixing blade | Qty. | 2×7 | 2×7 | 2×7 |
Mixing moter power | kW | 18.5 | 18.5 | 18.5 |
Lifting motor power | kW | 7.5 | 7.5 | 7.5 |
Length of steel wire rope | M | 14m | 17m | 22m |
Water pump power | kW | 0.75 | 0.75 | 0.75 |
Hopper lifting speed | m/min | 18 | 18 | 18 |
Dimension (L×W×H) | mm | 4485×3030×5280 | 5200×3140×6480 | 6400×3160×8580 |
- - · FAQ - -
1.Q: Are you a trading company or manufacturer?
A: We are a factory.
2.Q: How about the quality of your products?
A: With over 30 years of expertise in construction machinery manufacturing, our factory strictly adheres to national and international standards. Each piece of equipment undergoes rigorous testing before delivery.30 years of construction machinery manufacturing experience. All our machines meet strict national and international standards, and each equipment undergoes thorough testing before delivery.
3.Q: How about the price?
A: As a manufacturer, not a trading company, we offer prices lower than trade companies. We strive to provide the best possible quotes and offer discounts based on quantity.
4.Q: What are your service and payment terms?
A: We accept T/T (Telegraphic Transfer), Western Union, MoneyGram, L/C at sight, and Trade Assurance. A 30% deposit is required before production, with the remaining 70% payable before delivery.
5.Q:Do you provide after-sale service?
A: Yes, our machines come with a one-year warranty. Our professional after-sales service team is ready to resolve any issues quickly and thoroughly. We offer comprehensive after-sales service, including overseas engineer support.
6.Q: What is your international project experience?
A: Our international projects include the Kazakhstan Astana Capital Moving Project,ect,
the Russia Voronezh Nuclear Power Station,
the Shanghai Pengxin Mining Congo (Gold) Copper Project,
and the Equatorial Guinea National Highway Equipment General Contracting..