Customization: | Available |
---|---|
After-sales Service: | Video |
Warranty: | 6 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
item | unit | JS500-1.5 | JS500-2.7 | JS500-3.8 |
Charging | L | 800 | 800 | 800 |
Output | L | 500 | 500 | 500 |
Nominal output/h | m3/h | ≤25 | ≤25 | ≤25 |
Tatal power | kW | 26.75 | 26.75 | 26.75 |
Aggregate size(pebble/macadam) | mm | 80/60 | 80/60 | 80/60 |
Speed of mixing blade | r/min | 35 | 35 | 35 |
Mixing blade | Qty. | 2×7 | 2×7 | 2×7 |
Mixing moter power | kW | 18.5 | 18.5 | 18.5 |
Lifting motor power | kW | 7.5 | 7.5 | 7.5 |
Length of steel wire rope | M | 14m | 17m | 22m |
Water pump power | kW | 0.75 | 0.75 | 0.75 |
Hopper lifting speed | m/min | 18 | 18 | 18 |
Dimension (L×W×H) | mm | 4485×3030×5280 | 5200×3140×6480 | 6400×3160×8580 |
- - · FAQ - -
1.Q: Are you trading company or manufacturer?
A: We are factory.
2.Q: How about the quality of your products?
A: We are factory with more than30 years of construction machinery manufacturing experience. All of our machines are manufactured strictly according to the national and international standards, and we take a test on each equipment before delivery.
3.Q: How about the price?
A: We are manufacturer, not trading company, we can give you a lower price than those trade companies. We quote as low as possible for any customer, and discount can be given according to quantity.
4.Q: Service and Payment Terms?
A: We usually accept T/T(Telegraphic Transfer),western union, money gram,L/C at sight,trade assurance. 30% deposit before production, 70% should be paid before delivery.
5.Q:Do you provide after-sale service?
A:Yes, The warranty period of our machines is one year, and we have a professional after-sale service team to promptly and Thoroughly solve your problems. So After-sales Service was Provided and Engineers available to service machinery overseas.
6.Q:What`s the international project experience?
A: Kazakhstan Astana Capital Moving Project,
Russia Voronezh Nuclear Power Station,
Shanghai Pengxin Mining Congo(Gold) Copper Project,
Equatorial Guinea National Highway Equipment General Contracting.